CJIC Won Bid for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts.
CJIC Won Bid for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts.
Recently, CJIC won bid for Design, Supply, and Installation of low voltage and medium voltage lines and service connections in Burera and Gakenke Districts.
Covering the Burera and Gakenke areas of Rwanda’s Northern Province, the project mainly involves the construction of medium and low-voltage power lines, as well as supporting services including line design, equipment supply and installation.
2026-08-08
L’entreprise CJIC a remporté l’appel d’offre pour les travaux de mise à niveau/renforcement de trois stations de production d’eau potable à Ankadivori
2026-08-08
The company CJIC has won the tender for the upgrade/reinforcement of three drinking water production stations in Ankadivoribe, Faralaza and Vontovoron
2026-07-22
CJIC won the Bid for two lots of the Design, Supply, Installation, Testing and Commissioning of 2MW Solar PV Plant in 156 Constituencies of Zambia
2026-07-21
Main Structure of Jiangxi International's Chanson Apartment Project in Lubumbashi, DRC Successfully Topped Out
2026-07-21
Le gros ?uvre du projet de la Résidence Chanson à Lubumbashi (RDC), réalisé par Jiangxi International, est achevé avec succès